WA TendersRFT

Design and Construction of Two Rocks Marina Sewer Upgrades

watenders:DOT418625Department of Transport and Major InfrastructureBuilding and Facility Construction and Maintenance Services
Closes in
12 days
2026-01-29

Tender Overview

DTMI requires an experienced Contractor to design and construct the sewer upgrades as required at Two Rocks Marina (TRM).  Two Rocks Marina has two separate sewage disposal systems that service existing assets within the marina.  There is a limited sewage reticulation network that services the exis...

Share:
PostShareEmail

Need Help Responding to This Tender?

GovBid's AI analyzes requirements and generates compliant responses in minutes, not days.

Description

DTMI requires an experienced Contractor to design and construct the sewer upgrades as required at Two Rocks Marina (TRM). 

Two Rocks Marina has two separate sewage disposal systems that service existing assets within the marina.  There is a limited sewage reticulation network that services the existing internal lots located towards the northern end of the marina.  This network gravity feeds to a DTMI owned private pump station, that pumps sewage from there to a septic tank and leach drain system located on the north-eastern side of the DTMI owned lot.

There is additional sewage disposal infrastructure that services assets located in the southern end of the Marina.  This consists of some temporary septic holding tanks (SHT) to service the public toilet block that was installed in 2022.  This infrastructure is not connected to the infrastructure servicing the northern end of the marina.

It has also been identified that the yacht club, located in the southern part of the marina, has its own separate septic tank that operates in isolation.

The toilet block that was installed in 2022 initially had a development application (DA) approval for a waterless style toilet. This approval was later withdrawn during construction of the toilet block following advice received from the Department of Health (DoH) indicating that such a system would not be acceptable.

DTMI has committed to replacing the SHT’s as soon as practicable by connecting the toilet block to the Water Corporations sewerage network, notionally within 3 years. As such, this is the highest priority objective of this project.

Given the requirement to connect the toilet block to the main sewer network, an opportunity exists to also design a replacement sewage reticulation network, and remove the aging septic and leach drain disposal system in the northern precinct to enable the disposal of all sewage from TRM to the main sewer network.

DTMI has committed to replacing the SHT’s as soon as practicable by connecting the toilet block to the Water Corporations sewerage network, notionally within 3 years. As such, this is the highest priority objective of this project.

Given the requirement to connect the toilet block to the main sewer network, an opportunity exists to also design a replacement sewage reticulation network, and remove the aging septic and leach drain disposal system in the northern precinct to enable the disposal of all sewage from TRM to the main sewer network.

The Works will consist of separable portions as follows:

Separable Portion 1 – Design and construction of the Site A (southern) pumped discharge system.

Separable Portion 2Optional Works - Design of the Site B (northern) pumped discharge system.

Separable Portion 3Optional Works - Construct the new Site B Pumped Discharge System.

Documents (21)

DOT418625 - Addendum 1 - Advice.pdf

PDF144.9 KB

Download

DOT418625 - Addendum 1 Briefing Session and Advice.pdf

PDF146.7 KB

Download

DOT418625 - Addendum 3 Closing Date extension.advice.pdf

PDF163.2 KB

Download

DOT418625 - RFT - Attachment 1B - AS4902-2000 - Annexure Part E#3.pdf

PDF2.9 MB

Download

DOT418625 - RFT - Attachment 3 - PPR Specification - Part A#3.docx

DOCX350.3 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 1 - A01 1931-H-0100_A copy#3.pdf

PDF1.4 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 1 - A02 1931-H-0200_A copy#3.pdf

PDF1.7 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B01 CWP-GL12 Drawing Standards and Approvals Rev0 copy#3.pdf

PDF1.5 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B02 DoT Drawing Template copy#3.pdf

PDF434.5 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B03 TRM Sewer Upgrade_Performance Requirements specification.pdf

PDF1.8 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B04 Basis of Design Report copy#3.pdf

PDF4.4 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B05 Basis of Design Report-Appendices_A-I copy#3.pdf

PDF6.6 MB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B06 Drainage and Toilet Details As Constructed copy#3.pdf

PDF609.2 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B07 Services ASCON Two Rock Marina Upgrade copy#3.pdf

PDF805.3 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B08 DoT Electrical Services - Basis of Design_Rev9_Restricted .pdf

PDF947.8 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B09 Two Rocks submergence curve copy#3.pdf

PDF436.1 KB

Download

DOT418625 - RFT - Attachment 3 - Part B - PPR Appendix 2 - B10 Services Survey Requirements Rev 4 copy#3.docx

DOCX2.0 MB

Download

DOT418625 - RFT - Attachment 4 - Contract Sum Schedule#3.xlsx

XLSX70.7 KB

Download

DOT418625 - RFT - D & C Works TRM Sewer#3.docx

DOCX205.9 KB

Download

DOT418625 - RFT- Attchment 1A - Draft GCC AS 4902 Final#2.docx

DOCX415.6 KB

Download

DOT418625 Design and Construction of Two Rocks Marina Sewer Briefing Session Presentation - Attachment 1#4.pdf

PDF1.2 MB

Download

Key Information

Locations
Western Australia
View on tenders.wa.gov.au

Ready to Win More Tenders?

Join hundreds of businesses using GovBid to create winning tender responses with AI assistance.

No credit card required • 7-day free trial • Cancel anytime