The Mint currently uses SharePoint 2019 on premise (SP19), which will reach EOL in July 2026. The Mint is currently uplifting to M365, and as a part of this would like to migrate our Intranet site to SharePoint Online (SPO). The site size is approximately 20GB with 1 site collection with approximat...
The Mint currently uses SharePoint 2019 on premise (SP19), which will reach EOL in July 2026. The Mint is currently uplifting to M365, and as a part of this would like to migrate our Intranet site to SharePoint Online (SPO). The site size is approximately 20GB with 1 site collection with approximately 20 sites (not all will need to be migrated however).